Security Fencing
Anti climb mesh, welded steel palisade and eight foot perimeters with controlled access, specified around what you actually need to protect.
See security fencing Call about security fencing
AndersonFence Company
Calls 6am to 9pm, seven days a week
Industrial fencing
Perimeters built to be forgotten about. Heavy framework, gates sized for trucks and loaders, and footings that hold a line straight across rolling Piedmont ground.
Industrial fence pricing
Tell us roughly how many feet, what material, how tall, and what gates you need. We'll give you a ballpark range on the call. No site visit needed for a rough number.
Calls 6am to 9pm, seven days a week
Cost per foot, installed
Your exact number depends on the site. That's what the call is for.
Any number we put here would be wrong for your property. Two 300 ft runs of 6 ft chain link can be far apart once one needs barbed wire, a rolling drive gate and posts set through asphalt. Sites that post a "$X per foot" price usually add those later. We'd rather give you a real number for your site. One call does that.
Damaged section on site?
Repairing a hit or cut section usually costs a fraction of replacing the run.
Industrial fencing is bought once and expected to be there in twenty years, which changes every decision on the quote. Pipe wall, fabric gauge, footing size, gate type and the way the line handles grade all get specified against decades of service rather than against the lowest number that will stand up on handover day.
We install industrial fence across Anderson County and Greenville County, plus Easley and Clemson. Plant and warehouse perimeters, equipment and material yards, substation and utility compounds, pump and tank enclosures, rail served sites and long boundary runs across ground that never cooperates. Quotes are free, walked on site, with the framework spec written down.
Industrial scope has more moving parts than a commercial perimeter, mostly because of gates, grade and access. All of it goes on the quote before a post is set.
Where a site already has a standard drawing, a corporate fence spec or a utility specification, we build to it and quote against it line by line. That is easier than arguing about it after the fact and it makes our number directly comparable to anybody else bidding the same package.
The jump from commercial to industrial spec is usually driven by one of these, and often by several at once:
There is a version of this we will talk you out of. A quiet back line against woods, with nothing driving near it, rarely needs the same spec as the yard side of the same property. Spending the industrial budget where the equipment actually works and stepping the spec down where nothing touches the fence is usually the better plan.
Three perimeter builds cover most industrial sites here. The difference is not appearance, it is what the fence does when something hits it and how it ages in wet clay.
| Heavy galvanized chain link | Vinyl coated over galvanized | Welded steel mesh panel | |
|---|---|---|---|
| Cost per foot | Lowest of the three | Above galvanized, below panel | Highest |
| Impact behavior | Fabric deforms, then is retensioned or patched | Same, though a cut in the coating needs attention | Panel bends and is swapped as a unit |
| Corrosion path | Zinc protects, edges and cut ends wear first | Polymer jacket adds a barrier over the zinc | Coating over welds is the vulnerable point |
| Grade handling | Rakes with the ground over long rolling runs | Rakes the same way | Steps, which costs posts on uneven ground |
| Repair on site | Easiest, fabric and rail are stocked items | Straightforward, matching coating takes longer | Panel replacement, usually ordered in |
| Where it belongs | Long plant and yard perimeters | Frontage and anywhere appearance is checked | Compounds, equipment pens and gate bays |
Most industrial sites end up mixing them. Heavy chain link for the long runs where cost per foot dominates, panel around the compounds holding the expensive equipment, and coated fabric across whatever frontage gets looked at.
Two small choices matter more on an industrial fence than anywhere else. Fabric selvage, the finish at the top and bottom edge, can be knuckled or twisted, and a twisted top is a meaningful deterrent while a knuckled bottom is kinder to anybody working along the line. The bottom detail matters more. On a yard where material spills, debris drifts or a loader nudges the fence, a bottom rail or a tension wire stops the fabric from being pushed out at the base, which is the failure that starts most long term fabric damage.
Long runs reward planning. The order below is what keeps a mile of fence straight and a plant operating at the same time.
On a working plant we keep every section we open closed again the same day. That is a scheduling constraint more than a technical one, and it is the first thing we plan around rather than the last.
Piedmont ground does not give you flat perimeters. Industrial parcels across Anderson County and along the Greenville County line roll, drop into drainage swales and cross old fill from earlier site work, and a fence line has to deal with all three in the same run. Chain link fabric can rake with the grade, which is a real advantage over panel systems here, but rake has limits and the line still has to step where the drop gets steep. Where the fence crosses a swale we close the gap under the fabric rather than leaving a hole that widens with every storm.
Cecil series red clay is the dominant soil across more than 10 million acres of the southeastern Piedmont, and it defines the footing detail. It holds its shape, which is why posts stay plumb once they are set correctly, and it drains slowly, which is why a narrow hole is a water trap. Add about 48 inches of rain a year against a national average of 38, spread across a climate with no dry season, and a post carrying a heavy gate spends most of the year in wet ground.
The infrastructure here reflects the water too. Lake Hartwell, built by the US Army Corps of Engineers, covers about 56,000 acres with 962 miles of shoreline along the Anderson County edge, and the pump stations, utility compounds and equipment yards that go with that kind of water and power infrastructure are precisely the sites where an enclosure has to be right the first time.
56,000 acres, 962 miles of shorelineLake Hartwell borders Anderson County at that scale, and the pump, utility and equipment infrastructure along the corridor is exactly what an industrial enclosure exists to protect.
Gates are where industrial budgets get away from people. A single wide cantilever slide gate with an operator can cost more than several hundred feet of perimeter running beside it, so it is worth deciding early how many vehicle openings the site genuinely needs. Two well placed gates usually beat four convenient ones.
Two parts of an industrial perimeter cause more rework than everything else combined: the vehicle gates and the electrical detail around energized equipment.
Measure the widest thing that has to pass, then check the approach. A tractor trailer needs turning room on both sides of the opening, not just clearance through it, and a gate that technically fits but forces a three point turn will be run into within a year. We check the real path, including where a driver will actually swing the trailer, before we fix the opening width.
Double swing gates are the cheapest and need a clear level radius on the inside, which industrial yards often do not have. Ground track slide gates are inexpensive but the track collects mud, gravel and debris, and on a wet site that means a gate that jams. Cantilever slide gates carry the leaf on rollers with no ground track at all, which is why they dominate on industrial sites, and they need room alongside the opening for the counterbalance tail, generally around half the opening width again. Plan that space before you set the fence line.
A long metal fence running near high voltage equipment or transmission lines can pick up induced voltage, which is why substation and utility compound fences are grounded and electrically tied together to an engineered detail rather than simply built. That detail belongs to your electrical engineer or utility standard, not to a fence contractor. We build the fence to the grounding detail we are given, coordinate post positions with your electrical contractor so ground rods and the jumpers across gates and splices land where they should, and flag anything on site that will not work before we start rather than after.
Something will hit an industrial fence eventually. The spec decides whether that is a two hour fix or a purchase order. Chain link is the most repairable perimeter material we install because fabric, rail and fittings are common stock, and that repairability is a genuine argument for it over a panel system on a yard where vehicles work close to the line.
Why choose us
Industrial buyers usually have a drawing, a corporate standard or a utility specification already. We quote line by line against that document rather than substituting our own default and explaining it later, which makes our number directly comparable to any other bid on the same package. Where a spec calls for something we think is wrong for Anderson County ground, we say so during the walk instead of building it quietly.
Anderson takes about 48 inches of rain a year against a national average of 38, falling onto Cecil clay that drains slowly across more than 10 million acres of the Piedmont. Frost is not what sets post depth here, wind load and saturated clay are. Gate posts carrying a heavy leaf get the largest footings on the job, because that is where an industrial perimeter goes out of square first and it is the most expensive thing to put right.
We started in 2018 and have built 55 plus fences across Anderson County and Greenville County since, which means the rolling ground, the rock and the old fill are familiar rather than a surprise on day two. We walk sites and quote seven days a week, 7:00 AM to 7:00 PM, which fits around a plant shutdown better than a weekday only schedule does.
Service area
Every town below is inside our service area for industrial fencing. No trip charge, no minimum distance.
Questions we get asked
Decades, if the footings and the coating are right. On a properly specified galvanized chain link perimeter the fabric and framework will normally outlast several facility managers, and the parts that need attention along the way are gate hardware and impact damage rather than the fence itself.
What shortens it here is almost always water at the post. With about 48 inches of rain a year on slow draining Cecil clay, a narrow footing keeps steel wet year round and the post goes at grade while the fabric above is still sound. Wide footings, correct depth and a crowned top are the cheap part of a long service life.
We build the fence to the grounding detail your electrical engineer or utility standard provides, and we coordinate post positions so ground rods and jumper connections land where the drawing wants them. The electrical design itself belongs to your engineer, not to us, and we will not pretend otherwise.
What we do bring is sequencing. Grounding work goes in at specific points in the build, and a fence contractor who sets every post first makes life hard for the electrical contractor. Tell us the detail up front and we plan the sequence around it.
A cantilever slide gate, in most cases. It carries the leaf on rollers mounted to posts rather than running in a ground track, so mud, gravel and debris have nothing to jam. Ground track slide gates are cheaper and reliably become a maintenance problem on a wet site.
The tradeoff is space. A cantilever gate needs room alongside the opening for the counterbalance tail, generally around half the opening width again, and that space has to be clear and inside the fence line. Plan it before the perimeter is set rather than discovering it when the gate arrives.
Yes, and chain link is the material that handles it best. Fabric rakes with the grade over gentle slopes, which keeps the bottom of the fence close to the ground without stepping. Panel systems have to step, which costs posts and leaves triangular gaps at each step on sloped ground.
Where the grade gets steep or the line crosses a swale, we step the fence deliberately and close the gap underneath with a rail, a wire or a poured curb. A gap under a fence at a drainage crossing only gets bigger, because every storm moves more soil through it.
Yes. We sequence industrial work so every section we open is closed again the same day, and we plan which parts of the perimeter have to stay secure overnight before the first post comes out.
Our hours are 7:00 AM to 7:00 PM, seven days a week, which lets the disruptive stretches land on a weekend, before a shift change or during a scheduled shutdown. Phasing costs more than one continuous pass, and on a running plant it is nearly always the cheaper option once lost production is counted.
Repair, if the post line is sound. Chain link is the most repairable perimeter material there is, and on many industrial fences the posts are still plumb and solid while the fabric has been damaged, stretched out or pushed open at the base by years of yard traffic.
Replace when the posts have failed at grade, when the framework is too light for the fabric you now need, or when the gates have racked so far out of square that the openings no longer work. We walk the line and mark what is reusable rather than pricing a full replacement by default.
Related work
Anti climb mesh, welded steel palisade and eight foot perimeters with controlled access, specified around what you actually need to protect.
See security fencing Call about security fencing
Heavier pipe, thicker fabric and top rail or top wire rated for real perimeter duty, in galvanized or black vinyl coated finish.
See commercial chain link Call about commercial chain link
Walk gates, double drive gates and cantilever slide gates, hung on posts sized for the leaf so they still swing true in year five.
See gates Call about gatesFree on-site quotes for industrial perimeters, compounds and vehicle gates across Anderson and Greenville County, seven days a week from 7am.
Seven days · Main hours 7am to 7pm · Early and evening calls 6 to 7am, 7 to 9pm