Commercial Fencing
Fencing for businesses, warehouses, churches, schools and rental property across the Upstate, scheduled so it does not shut your site down.
See commercial fencing Call about commercial fencing
AndersonFence Company
Calls 6am to 9pm, seven days a week
Commercial wood
Solid screening for the places a code, a landlord or a tenant will not accept wire. Built on ground contact posts, with the maintenance cost explained before you sign.
Commercial wood fence pricing
Tell us roughly how many feet, what material, how tall, and what gates you need. We'll give you a ballpark range on the call. No site visit needed for a rough number.
Calls 6am to 9pm, seven days a week
Cost per foot, installed
Your exact number depends on the site. That's what the call is for.
Any number we put here would be wrong for your property. Two 300 ft runs of 6 ft chain link can be far apart once one needs barbed wire, a rolling drive gate and posts set through asphalt. Sites that post a "$X per foot" price usually add those later. We'd rather give you a real number for your site. One call does that.
Damaged section on site?
Repairing a hit or cut section usually costs a fraction of replacing the run.
Commercial wood fencing gets specified for one of two reasons: somebody wrote it into a rule, or somebody has to look at it. A zoning ordinance calling for opaque screening, a landlord's lease naming wood by material, or a restaurant patio where a chain link boundary would cost you covers. Wire will not solve any of those, and that is the whole argument for wood on a commercial site.
We build commercial wood fence across Anderson County and Greenville County, plus Easley and Clemson. Apartment and townhome property lines, patio and outdoor dining surrounds, trash and equipment screening, tenant build outs and church grounds. Framed and fastened on site, not dropped in as prefab panels, because a commercial run rarely ends on a perfect eight foot multiple.
A wood fence on a working property is a system: what is in the ground, what carries the boards, and what the boards are fastened with. All of it is on the quote.
Stain and sealer are quoted separately, and we will not apply them the day the fence goes up. Freshly treated pine has to dry before it takes a finish, and sealing wet lumber traps the water you were trying to keep out.
Wood wins on a commercial property when the requirement is visual, not structural. The situations below come up constantly in the Upstate:
Wood is the wrong call where the fence has to stop something. It screens well and secures poorly, a boot goes through a picket, and a six foot wood fence in a dark parking lot removes the sightline your cameras need. On a security perimeter, spend the money on steel and use wood only where the screening rule forces it.
Three builds cover most commercial wood work here. The choice is really about how long you want to own the fence and who is paying to maintain it.
| Pressure treated pine | Western red cedar | Wood infill on steel posts | |
|---|---|---|---|
| Up front cost | Lowest per foot | Meaningfully above pine | Wood cost plus the steel post premium |
| Where it fails first | The post, at ground level | The post, at ground level | Nowhere below grade, the infill is the wear part |
| Look when new | Green or tan, wet and heavy | Warm red brown, lighter and straighter | Matches whichever infill you pick |
| Movement as it dries | Shrinks and cups, gaps open in year two | More stable, far less cupping | Boards still move, the frame does not |
| Termites | Ground contact treatment is the defense | Heartwood resists, it is not immune | Nothing edible below grade |
| Best commercial use | Long apartment and trash area runs | Patios, dining, anything customers see | Any line you plan to keep fifteen years |
There is a fourth question layered on top: solid board, board on board, or shadowbox. Solid board is cheapest and gaps as it dries. Board on board overlaps the joints so it stays private after shrinkage, which is what we recommend on an apartment line. Shadowbox alternates sides of the rail, looks finished from both properties and lets wind pass, which matters on the long exposed runs behind buildings.
Six feet is the working standard for commercial screening and eight feet shows up where a code calls for it or where the grade drops away. South Carolina has no statewide fence permit and no state height limit, so the number comes from your city or county. In the City of Anderson, watch the sight triangle at driveways and intersections, where nothing forming a material impediment to visibility may sit between 42 inches and 10 feet above roadway grade. A solid six foot screen run to the edge of a commercial drive is exactly what that rule is written against.
Built on site, in this order, whether it is forty feet around a patio or a thousand feet along an apartment line.
On an occupied property we phase it. A section comes out, goes back up and gets closed before the next section is opened, so an apartment community is never left with an open line overnight.
Two conditions decide how long wood lasts here, and both are worse than the national average. South Carolina sits in one of the heaviest termite pressure zones mapped in the residential code. That is not a marketing line, it is the reason ground contact rated lumber is the baseline on a commercial job here and not an upgrade item somebody can value engineer out.
The second is water. Anderson takes about 48 inches of rain a year against a national average of 38, and the humid subtropical climate spreads it across all twelve months with no dry season. Cecil series red clay, the dominant soil across more than 10 million acres of the southeastern Piedmont, drains slowly, so a post hole holds what falls into it. A wood post in a wet hole rots at the ground line where air and water meet, which is why a commercial wood fence almost never fails in the middle of a board.
The housing and commercial stock reflects it. Older apartment lines around Anderson, Belton and Williamston are frequently on their second or third wood fence, with sound rails and boards sitting on posts that snapped at grade. When we walk one of those, the honest answer is often to rebuild on new posts and reuse what is good above them, which is a different number from a full replacement.
Heaviest termite pressure in the codeSouth Carolina sits in one of the most severe termite zones mapped in the residential code, so ground contact rated lumber on a commercial wood fence here is the starting point, not an option.
One thing that moves a commercial wood number more than a residential one is phasing. Building four hundred feet in three stages so an apartment community is never open costs more than building it in one pass, and for an occupied property it is usually worth it.
Wood is the only material we install that has an ongoing cost after we leave. Anybody who tells you otherwise is selling you a surprise in year four.
Pressure treated lumber arrives wet. Sealing it immediately locks that moisture in and the finish lifts. We let a new pine fence dry through a season, then wash, dry and seal it. Cedar can take a finish sooner, but it still wants to be clean and dry first.
In Upstate sun and humidity, a stained commercial fence holds its finish for a few years and then needs washing and resealing. Put it in the property budget on a cycle rather than waiting for a board to gray, cup and split. A fence that gets recoated on schedule lasts years longer than one left to weather, and on a hundred unit apartment line that gap is real money.
Expect to replace occasional boards on a commercial run. Vehicles reverse into them, storms take limbs down, and a board that cups badly is easier to swap than to argue with. That is why we fasten with screws: a board comes off and a new one goes on without pulling the rail apart. What should not need replacing is the post, which is the whole argument for ground contact rated stock or steel posts under the wood.
On commercial property the maintenance responsibility is usually written down somewhere, in a lease, a management agreement or an HOA covenant. Find out before the fence goes in. We have quoted several jobs where the landlord owned the fence and the tenant owned the maintenance, and neither one knew it until a board fell into a parking space.
Why choose us
South Carolina sits in one of the heaviest termite pressure zones mapped in the residential code, and Anderson takes about 48 inches of rain a year onto slow draining clay. Above ground rated lumber buried in that ground is the single most common reason a commercial wood fence fails early. We quote ground contact rated posts as standard and will tell you exactly which stock is going in the hole.
A commercial wood fence has a running cost and a property budget should carry it. We tell you at quote stage when the fence will be ready for its first seal, roughly how often it will want recoating in Upstate sun and humidity, and what board replacement looks like on a run that length. Nobody has to discover that in year four with a maintenance request already open.
We have been building fence in Anderson County and Greenville County since 2018 and have put up 55 plus fences since, a large share of them wood. That is enough repetition to know which lines cup, how far a pine fence shrinks by its second summer, and why board on board is worth the extra lumber on an apartment line.
Service area
Every town below is inside our service area for commercial wood fencing. No trip charge, no minimum distance.
Questions we get asked
The boards usually outlive the posts, and the posts decide the answer. On ground contact rated posts set in properly drained, crowned concrete, a commercial pine fence here has a long service life with periodic board replacement. On above ground rated posts it can fail at grade in a fraction of that.
Climate is why. About 48 inches of rain a year falls on slow draining Cecil clay, and South Carolina sits in one of the heaviest termite pressure zones in the residential code. Both attack the same few inches of post at ground level. Steel posts with wood infill remove that failure point entirely and are worth pricing on any line you intend to keep.
Often not. Many commercial screening standards ask for an opaque or solid screen, and privacy slats give partial coverage rather than a solid surface. If the ordinance or the lease uses the word opaque or solid, slats are a risk.
Bring us the actual wording. We read the local rule during the site walk and quote to what it says, because the cheapest version of this job is the one that passes the first time. If slats genuinely do satisfy it, we will tell you and save you the difference.
Pine for long runs where the fence is functional and budget matters, cedar where customers or residents look at it every day. Pine is cheaper per foot and, ground contact rated, perfectly durable. Cedar is more stable, cups less and holds a finish better.
There is a middle option worth pricing. Steel posts with wood infill lets you buy cheaper infill lumber and still remove the part that rots. On a fifteen year hold it usually costs less than rebuilding a pine fence once.
Yes, and it is one of the more common commercial wood jobs we quote. A dining surround is different from a property line fence: it needs a finished look on both sides, gate widths that suit service traffic, and a footing detail that works next to a concrete patio rather than in open ground.
Check the local rule on height and on defining an alcohol service area before you build, because that requirement sets the design more than taste does. Bring us the standard your city applies and we will quote to it.
Yes. We phase occupied properties so no run is left open overnight. A section comes down, goes back up and is closed before the next section is opened, and gates are the first thing rehung rather than the last.
It costs more than doing the whole line in one pass, because it means more setups and more partial days. For a community with residents, pets and parking behind that line it is the only sensible way to do it, and we will lay out the sequence before the first post comes out.
Yes, on a second visit. Freshly treated lumber holds too much moisture to take a finish, and sealing it wet traps the water and makes the coating lift within a year.
We quote the fence and the finish as separate lines so the property can budget them separately, and we will tell you roughly when the wood will be ready. Cedar takes a finish sooner than wet treated pine, which is one more reason cedar earns its price on a customer facing run.
Related work
Fencing for businesses, warehouses, churches, schools and rental property across the Upstate, scheduled so it does not shut your site down.
See commercial fencing Call about commercial fencing
Screened enclosures with gates heavy enough to survive a hauler, built to the screening standard your city or landlord requires.
See dumpster enclosures Call about dumpster enclosures
Entrance fencing, amenity and pool area enclosures and long common area runs, matched to an existing spec so the neighborhood stays consistent.
See hoa & community Call about hoa & communityApartment lines, patios, dining areas and trash screening, measured and priced on site across the Upstate. No deposit, no obligation.
Seven days · Main hours 7am to 7pm · Early and evening calls 6 to 7am, 7 to 9pm