Open seven days a week, 7am to 7pm Serving Anderson County and Greenville County
Rated 4.7 out of 5 by 24 Google reviewers across the Upstate Read the reviews
Cedar fence running along a wooded mountain property line near Cleveland, SC

Greenville County, SC

Fence Company in Cleveland, SC

The steepest, rockiest ground we work. Fences in the upper end of Greenville County get built to the slope, the weather and the trees, or they do not last.

8Years in business
55+Fences built
4.7★24 Google reviews
7 days7am to 7pm
$0On-site quotes
2Counties served

Anderson Fence Company is a fence company in Cleveland, SC, working the mountain end of Greenville County where US 276 and Highway 11 cross, a little under nine miles north northwest of Travelers Rest. The community has had its own post office since 1900, and the 2020 census counted about 1,347 people spread across it.

Cleveland is the last settlement before the escarpment. Caesars Head State Park and its 3,215 foot summit sit above it, and the Mountain Bridge Wilderness Area, which takes in Jones Gap State Park and Wildcat Wayside alongside Caesars Head, wraps around a good deal of the surrounding land. Nobody up here has a flat rectangular lot, and that single fact drives every fence decision we make in Cleveland.

Digging in mountain ground

An auger that spins freely all day across an Upstate subdivision will stop dead in the first hour up here. Under the leaf mold and the thin soil there is rock, and where there is not rock there is often steep ground that a machine cannot safely sit on. So a Cleveland fence line gets dug three ways: machine where we can, two man auger where we cannot, and bar and breaker where the hole has to be made rather than drilled.

That matters to a quote more than the material does. Two hundred feet of cedar privacy on level ground and two hundred feet of the same fence up a wooded bank are not the same job, and we do not pretend otherwise on the estimate. What we do promise is that the post goes to full depth or we change the approach and tell you what we changed.

Slope also decides how the fence meets the ground. Stepping each panel level and dropping it down the hill is quick and looks orderly, but it leaves a wedge shaped gap under the low end of every section, and on a mountain lot that gap is a doorway for anything on four legs. Raking, where the rails follow the grade and the pickets stay plumb, keeps the bottom tight to the dirt the whole way. We rake anything that has to contain, and we step only where a gap costs nothing.

Rackable aluminum is worth a mention here because it handles moderate grade on its own. The panels pivot at every picket and follow the fall of the land without a single cut, which on a steep front yard often gives a better result than wood for less labor.

Weather at the top of the county

Fences in Cleveland deal with things that fences in Greenville never see. Ice loads limbs until they come down on a fence line. Wind funnels along the ridges and pushes on a solid privacy panel like a sail. Runoff from an uphill neighbor's property crosses your line during a hard rain, and the Upstate gets plenty of those, with the region averaging around 48 inches a year.

The design answers are simple and worth paying for. Shorten post spacing on exposed runs rather than stretching it. Use shadowbox or a spaced picket where wind is a problem, because a fence that lets air through does not get pushed over. Keep the fence line out from under the worst of the overhanging hardwood where you have a choice, and expect to repair a section every few years where you do not.

A lot of property up here is a second home, a cabin or a rental, and stands empty for stretches at a time. That is an argument for materials that need nothing done to them. Chain link, aluminum and cedar all go months unattended without complaint. Untreated pine left to weather on a damp shaded mountain lot does not, and South Carolina sits in one of the heaviest termite pressure zones in the residential code on top of that.

3,215 feet at Caesars HeadThe summit above Cleveland, which is a fair reminder that the ground under a fence up here is nothing like the ground under one in town.

Rated 4.7 on Google

What Upstate customers say

Every review below is a real Google review from a customer in the Upstate. 24 reviews, 4.7 star average.

They gave me a free quote. They were very helpful with my questions and concerns. They have some beautiful ideas and work.

Carolyn Johnson 4 reviews · Google review

They delivered exceptional craftsmanship and service. The personnel made sure I was satisfied at every turn, and the fence is strong.

George Potts 4 reviews · Google review

I called and they came out quickly. They assessed the property and gave me the best offer around. My family and I are grateful.

Emmanuel Walker 1 review · Google review

Read all 24 reviews

Questions we get asked

Fence questions from Cleveland homeowners

Can you build a fence on ground this steep?

Yes, and steep ground is a large share of what we build in the upper county. The work is in the layout rather than the material. We walk the run with a level and a tape, mark where the grade changes, and decide section by section whether the fence steps down the hill or rakes with it. Where a fence has to contain a dog or enclose a pool, it rakes, because a stepped panel leaves a gap under its low end every single time.

Some of it we solve with product rather than labor. Rackable aluminum follows a moderate slope on its own, and chain link fabric conforms to grade naturally. Where the ground is too steep for either, we build in shorter sections with tighter post spacing. The one thing we will not do is set a fence that looks right on the day and slides out of line after two wet seasons.

What happens when you hit rock?

Up here, we expect it. The first response is to move the post. A shift of six or eight inches usually finds diggable ground, and across a long run nobody can see that the spacing changed. When the rock runs continuous, the hole gets opened by hand with a bar and a breaker until we have full depth, which costs time but gives a proper setting.

Where full depth genuinely is not achievable, we stop and talk to you rather than improvising. The options are a wider concrete collar, a rock anchored setting, or relocating a corner by a few feet. All of those are honest fixes. Setting a short post and hoping the concrete holds is not, and that shortcut is behind a good number of the leaning fences we get called out to replace.

Which fence survives best on a property that sits empty part of the year?

Anything that does not need maintenance. Chain link, ornamental aluminum and cedar all sit unattended through a winter and come out fine. Vinyl does too, though it is less common up here because it wants a straighter line than mountain ground usually gives. What suffers is untreated or lightly treated pine on a damp, shaded lot, where rot and termite pressure work on it the whole time nobody is there.

The other thing to plan for on a seasonal property is falling timber. Ice and wind bring limbs down, and a fence under a big hardwood will take a hit eventually. Building in sections that can be replaced individually, rather than long continuous panels, means one bad limb costs you one section instead of forty feet. We lay it out that way on wooded lots without being asked.

Ready for a fence quote in Cleveland?

Free on-site estimates, seven days a week, 7am to 7pm.

Call Now Free Quote