Gate Installation
Walk gates, double drive gates and cantilever slide gates, hung on posts sized for the leaf so they still swing true in year five.
See gates Call about gates
AndersonFence Company
Calls 6am to 9pm, seven days a week
Automatic gates
A motor does not make a gate stronger. It just opens and closes it several thousand times a year, which is why the gate and the posts get specified before the operator does.
Automatic gate pricing
Tell us how wide the opening is, what it's made of, and whether you want an opener. We'll give you a ballpark range on the call. No site visit needed for a rough number.
Calls 6am to 9pm, seven days a week
Relative cost per gate
Your exact number depends on the opening and the ground. That's what the call is for.
A 4 ft walk gate on flat ground and a 12 ft drive gate on a slope are different jobs. Even two gates the same width can be hundreds of dollars apart once you add heavier posts or a swing that has to clear the grade. Sites that post a flat gate price usually add to it later. We'd rather give you a real number for your gate. One call does that.
Gate dragging or won't latch?
Resetting a sagging gate is usually a small repair, not a new gate.
Automatic gate openers are three jobs wearing one name: the gate itself, the power and control wiring that reaches it, and the operator bolted to the post. Most of the failures we get called to are the first two, not the motor.
We fit swing and slide operators to residential driveways and commercial yards across Anderson County and Greenville County, on gates we build and on gates that are already standing. We give a ballpark on the call, and the firm quote is free and done on site, because this is not a job anyone can price exactly from a phone call.
An automation quote covers everything between the power source and the finished, tested gate. The parts people forget are all in the ground.
If the gate needs work before the operator goes on it, that appears as its own line on the quote. We would rather show you the cost of fixing the gate than hang a motor on something that will not survive it.
Automation earns its money on frequency, weather and access control. The usual reasons people go ahead:
It is not always the right spend. A gate opened twice a week on a short driveway is hard to justify automating, and we will say so. What we will suggest in that case is running conduit while the ground is open, so the option stays cheap later.
Three operator types cover almost all residential and light commercial work here. The gate and the driveway decide which one, not the other way around.
| Articulated arm | Linear ram | Slide operator | |
|---|---|---|---|
| Gate it drives | Swing gates, one arm per leaf | Swing gates, one ram per leaf | Cantilever and rolling slide gates |
| How it mounts | Jointed arm from a post or column to the leaf | Straight actuator close to the hinge line | On a pad beside the gate, driving a toothed rack |
| Wide posts or columns | Handles them well, the joint reaches around | Struggles, it needs a tight hinge geometry | Not affected |
| Slope on the driveway | Poor, a swing leaf has to clear rising ground | Poor, same problem | Very good, nothing swings over the ground |
| Visibility | The most visible of the three | Tidy, largely hidden behind the leaf | A box beside the opening |
| Typical failure | Arm joints and mounting brackets wear | Ram seals and the hinge geometry it depends on | Rack teeth, alignment and debris in the path |
| Best for | Masonry columns and gates that swing in | Ornamental metal gates on standard posts | Steep, short or busy driveways |
Power is the other choice. Most residential operators run on low voltage DC from a battery that a transformer or a solar panel keeps charged, which is why a properly set up gate still works during an outage. Solar is the practical answer on long rural driveways where trenching several hundred feet of conduit to the road would cost more than the operator.
The sequence is built around one rule: nothing gets powered until the gate itself is right.
Most residential automations are a one or two day job once the gate is sound. Trenching distance and driveway crossings are what stretch it, which is why we would rather do this at the same time as the gate.
Water is the first local problem. Around 48 inches of rain a year falls here onto slow draining Cecil clay, and a trench is a drain until it is properly backfilled. Conduit gets sealed at both ends, splices stay out of the ground or go in an approved box, and the operator sits on a pad above the surrounding grade rather than in the low spot beside the driveway. Control boards die from moisture far more often than from use.
Ground movement is the second. Frost depth is shallow in the Upstate, so post depth here is driven by wind load and saturated clay rather than by freezing. That matters for a powered gate because the operator pushes against the post several thousand times a year, and a solid infill gate is a sail in a thunderstorm. Gate posts carrying an operator get set deeper and in more concrete than anything else on the property.
Then there is distance. Plenty of properties around Townville, Starr, Iva and the Lake Hartwell shoreline sit a long way from the road, and the cost of getting line voltage to the gate can exceed the cost of automating it. That is where solar changes the arithmetic. A low voltage operator with a battery and a panel in an open spot runs a residential gate at a few cycles a day without a single foot of trench to the house.
Frost is not the design caseUpstate post depth is set by wind load and saturated clay, which is exactly what a post carrying a gate operator has to resist every cycle.
The operator is rarely the biggest number on the quote. What moves the total:
The single biggest saving available is timing. Setting heavier posts and burying conduit during a gate or fence build costs a small fraction of trenching and cutting a finished driveway later.
An operator is a machine that takes a gate to its limits on a schedule. Everything a hand opened gate gets away with, a powered one exposes within months.
Slope deserves its own note. A swing gate has to clear rising ground through its entire arc, so on a driveway that climbs away from the road the leaf has to be hung high, cut to the grade, or replaced with a slide gate that never crosses the ground at all. Getting that wrong is the most common reason a powered swing gate stops halfway and reverses.
A powered gate is a moving machine next to a driveway where people walk. Operator safety standards call for the machine to sense an obstruction on its own and for a second, independent device to cover each entrapment point, which in practice means photo eyes across the opening or a safety edge on the leading edge. Loops in the driveway do the rest: an exit loop opens the gate as you approach from inside, and a safety loop stops it from closing on a vehicle sitting under it.
We set the obstruction force as low as the gate will tolerate, test it before we leave, and make sure you know how to release the operator by hand. On a powered gate that strength is not decoration, it is what the motor is pushing against every day.
Why choose us
Every automation quote we write starts with the leaf swung by hand, the posts pushed on and the hinges looked at. Across the 55 plus fences and gates we have built since 2018, the powered gates that gave trouble were the ones bolted onto marginal hardware. If your gate needs a post reset or a re-squared frame first, that goes on the quote as its own line rather than becoming a warranty call in six months.
Automation companies fit operators. We build the gate, set the posts, hang the leaf and then automate it, which means one crew owns the whole result. That matters when something needs adjusting, because there is nobody to point at.
Around 48 inches of rain a year on slow draining clay is hard on buried conduit and on control boards, so we seal conduit, keep splices out of the ground and set operators above grade. On the long rural driveways around Townville, Starr and the Lake Hartwell shoreline we will price solar against trenching and tell you plainly which one makes sense for your distance.
Service area
Every town below is inside our service area for automatic gates. No trip charge, no minimum distance.
Questions we get asked
Often yes, and the answer comes from the gate rather than the motor. We look at the weight and length of the leaf, the size and plumb of the hinge post, the hinges themselves and whether the gate is still square. If those are sound, an operator can go on.
If the gate sags, binds or leans, that gets fixed first. Automating a marginal gate does not hold it together, it accelerates everything that was already wrong, because the motor repeats the same load thousands of times a year without ever easing off.
You need power at the gate, but not always from the house. Most residential operators run on low voltage DC from a battery, and that battery can be charged either by a transformer fed from your electrical system or by a solar panel mounted at the gate.
Which way we go is usually decided by distance. A gate near the house is cheapest to feed by conduit. A gate several hundred feet down a driveway is often cheaper and simpler on solar, provided the panel gets real sun rather than sitting under a tree line.
A low voltage operator with a healthy battery keeps working through an outage, typically for a number of cycles before the battery needs charging again. That is one of the practical advantages of DC operators over line voltage units.
Every operator also has a manual release, usually a key or a lever that disconnects the drive so the gate can be pushed by hand. We show you where it is and make you use it once before we leave, because the time to learn it is not at night in the rain.
Look at the ground and the room first. A swing gate needs a clear arc and level or falling ground through that arc, so a driveway that climbs away from the road usually wants a slide gate instead.
A slide gate also wins where the driveway is short, since a swing leaf needs space to open without blocking the road or your parking. The tradeoff is that a cantilever slide needs run back room beside the opening, roughly half again the width of the gate, and that strip has to stay clear.
A keypad on a post at the driveway is the simplest answer, and codes can be changed or given out per person. For more control, a callbox rings your phone so you can talk to whoever is at the gate and open it remotely.
Getting out is usually automatic. An exit loop buried in the driveway detects your vehicle and opens the gate as you approach from inside, so nobody needs a remote to leave. Remotes, keypads and loops are commonly all fitted to the same gate.
They are when the safety devices are specified and set properly. The operator itself senses an obstruction and reverses, and a second independent device covers each entrapment point: photo eyes across the opening, or a safety edge on the leading edge of the gate.
Setup matters as much as the parts. We set the obstruction force as low as the gate will run on, add safety loops where vehicles stop under the arc, and keep the swing path clear of anything that could trap a person between the gate and a fixed object. A powered gate is a machine and it deserves to be treated like one.
Related work
Walk gates, double drive gates and cantilever slide gates, hung on posts sized for the leaf so they still swing true in year five.
See gates Call about gates
Anti climb mesh, welded steel palisade and eight foot perimeters with controlled access, specified around what you actually need to protect.
See security fencing Call about security fencing
Fencing for businesses, warehouses, churches, schools and rental property across the Upstate, scheduled so it does not shut your site down.
See commercial fencing Call about commercial fencingFree on-site quotes for automatic gate openers across Anderson County and Greenville County, seven days a week from 7am to 7pm.
Seven days · Main hours 7am to 7pm · Early and evening calls 6 to 7am, 7 to 9pm