Automatic Gate Openers
Swing and slide operators with keypads, remotes and safety loops, wired to a driveway gate that was built heavy enough to take the motor.
See automatic gate openers Call about automatic gate openers
AndersonFence Company
Calls 6am to 9pm, seven days a week
Gates and hardware
A gate is the only part of a fence with moving parts, so it is the part that fails first. Post size, hinge rating and bracing decide whether it still latches in year five.
Gate pricing
Tell us how wide the opening is, what it's made of, and whether you want an opener. We'll give you a ballpark range on the call. No site visit needed for a rough number.
Calls 6am to 9pm, seven days a week
Relative cost per gate
Your exact number depends on the opening and the ground. That's what the call is for.
A 4 ft walk gate on flat ground and a 12 ft drive gate on a slope are different jobs. Even two gates the same width can be hundreds of dollars apart once you add heavier posts or a swing that has to clear the grade. Sites that post a flat gate price usually add to it later. We'd rather give you a real number for your gate. One call does that.
Gate dragging or won't latch?
Resetting a sagging gate is usually a small repair, not a new gate.
Gate installation is the part of a fence job where the engineering actually shows. A fence panel just stands there. A gate hangs off one edge, gets pushed, pulled and slammed several times a day, and every one of those loads tries to twist it into a parallelogram.
We build and hang walk gates, double drive gates and cantilever slide gates across Anderson County and Greenville County, in wood, vinyl, aluminum, steel and chain link. We also rebuild and rehang gates on fences we did not install, which is most of the gate work we do.
A gate quote from us covers the opening as a system: the posts on both sides, the leaf, the hardware and the ground it swings over.
On a new fence, the gate posts go in first and heavier. On a repair, the first thing we check is whether the post is still plumb, because rehanging a good gate on a leaning post buys you a few months at most.
Gates give plenty of warning before they quit. These are the symptoms, in roughly the order they appear:
Caught early, most of these are an afternoon: reset a post, add a brace or a tension cable, fit a rated hinge set. Left alone, the leaf twists permanently and the frame has to be rebuilt. That is the normal outcome while the post is still sound.
The opening width and the ground decide which of these you need. Trying to make one do another one's job is the root of most gate failures we are called out to.
| Walk gate | Double drive gate | Cantilever slide | |
|---|---|---|---|
| Typical width | Three to five foot single leaf | Ten to sixteen foot, split into two leaves | Twelve foot and up in one moving panel |
| Space needed | A clear arc on one side | A clear arc for both leaves, inside or out | Run back room beside the opening, about half again the opening |
| Posts | Heavier than line posts, set deeper | Two heavy posts, each carrying half the span | A post set with rollers and a heavy counterbalance end |
| Ground and slope | Hinge height set to clear the high point of the arc | Struggles on a rising driveway without rising hinges | Ignores slope, since nothing swings over the ground |
| Hardware | Two or three hinges plus a latch | Hinges, latch and a drop rod into a ground sleeve | Rollers, guides, catch and a stop |
| Automation | Rarely worth it | Two swing operators, one per leaf | One slide operator, the simpler retrofit |
| Best for | People, mowers, trash cans | Driveways with room to swing | Steep or short driveways, and commercial yards |
The width limit on a single swing leaf is real. Past about five feet in wood, the leverage on the hinge side grows faster than the frame can resist, and a six foot single leaf will sag unless it is a welded steel frame with a tension cable. That is the point where we split it into a double or move to a slide.
The order matters here more than anywhere else on a fence, because everything after the posts depends on those posts being right.
A gate that is adjusted while the concrete is still green will need adjusting again in a month. Waiting is the cheapest quality control there is.
Gate posts fail here for a specific reason. Cecil clay drains slowly, so a post hole holds water long after the rain stops, and around 48 inches of that rain falls on Anderson every year. A post carrying a gate is already being levered sideways every time the leaf swings, and saturated clay around the footing gives that lever somewhere to move. Frost is not the issue in the Upstate. Wet clay and wind load are, which is why gate footings here are about width and crowning rather than depth alone.
Humidity works on the leaf itself. This is a humid subtropical climate with no dry season, so wood gates take up and give back moisture all year and a leaf built tight in August binds in February. We leave clearance at the latch side and use bracing and hardware that can be re-tensioned rather than replaced.
Pool gates are the one place where the hardware is not a preference. South Carolina builds to the International Residential Code, which sets a minimum 48 inch barrier around residential pools and requires gates that are self closing and self latching. That changes the hinge, the latch and the swing direction, and it is worth getting right the first time.
48 inch minimum pool barrierThe residential code South Carolina builds to requires self closing, self latching gates on that barrier, so pool gate hardware is specified rather than chosen.
Gates cost more per foot than fence, and the reasons are all structural:
If a powered gate is anywhere in your plans, say so at the quote. Setting a heavier post and running a sleeve under the driveway while the ground is open costs a fraction of retrofitting both later.
Understand three forces and every gate problem in this trade makes sense.
A four foot leaf puts its weight two feet out from the hinge. A twelve foot leaf puts it six feet out, and that load never lets up. The hinge post is not holding weight, it is resisting a constant twisting moment, which is why it needs to be bigger and set in more concrete than the fence post beside it. Most gates that fail in this county did not break, their post rotated.
Any four sided frame will rack under load unless something stops it. In wood, the fix is a diagonal in compression running from the bottom corner on the hinge side up to the top corner on the latch side, so the brace is pushed rather than pulled. Run it the other way and it is a decoration. On steel frames the diagonal is welded in or replaced with a cable and turnbuckle pulling from the top hinge corner down to the bottom latch corner, which is the direction that takes the sag out.
Hinges carry a stated weight. Screws into end grain do not, which is why a through bolted hinge holds when a screwed one pulls out. Tall leaves take three hinges, not two, so the load is shared and the top one is not doing all the work. Latches wear at the strike, and a latch that only catches when you lift the gate is telling you the geometry has already moved.
Most sagging gates are repairable without touching the fence. We reset or sleeve the post, rebuild or re-square the leaf, fit an anti sag cable, and change the hardware for a rated set. Our fence repair service covers the post side of that work.
Why choose us
The gate post is the single most common failure on residential fencing, and it is a sizing decision made on day one. We size gate posts and footings against the width and weight of the leaf they carry, which means a heavier post and several times the concrete of a line post. Across the 55 plus fences we have built since 2018, the gates have outlasted the complaint that brings most people to us in the first place.
A large share of our gate work is repair, not installation. That is the usual outcome: reset the post, re-square the leaf, and fit a rated hinge set, 3 hinges on a tall leaf rather than 2. The gate you already own works again for a fraction of a replacement.
Gates fail at inconvenient times, usually with a dog or a driveway on the wrong side of them. We take calls from 6am to 9pm, seven days a week, and cover every town in Anderson County and Greenville County plus Easley and Clemson. Eight years in the same service area means we have seen your gate's failure before.
Service area
Every town below is inside our service area for gate installation. No trip charge, no minimum distance.
Questions we get asked
Almost always one of two things: the hinge post has rotated in the ground, or the leaf itself has racked out of square. You can tell them apart in ten seconds. If the gap at the latch side is even but the whole gate has dropped, the post moved. If the gap is wider at the top than the bottom, the frame racked.
Both are fixable. A rotated post gets reset or sleeved with a proper footing, and a racked leaf gets re-squared with a compression brace or a cable and turnbuckle. Doing the second without fixing the first just moves the problem, which is why we look at the post before we quote anything.
About five feet is the practical limit for a single wood leaf. Beyond that, the leverage at the hinge side grows faster than a wood frame resists it, and the gate begins to sag no matter how well it was built.
Wider openings go one of three ways: a double gate with two leaves and a drop rod, a single leaf on a welded steel frame with a tension cable, or a cantilever slide. Which one depends on how much room you have to swing and whether the driveway rises away from the gate.
Yes, and it is a common job. We cut the opening, set proper gate posts on both sides with footings sized for the leaf, and build the gate to match the existing fence as closely as the weathering allows.
The part that cannot be skipped is the posts. Hanging a gate on an existing line post is the single fastest way to end up with a leaning post and a gate that drags, because line posts are sized to hold fence, not to resist a lever.
Self closing hinges and a self latching latch, on a barrier at least 48 inches high, because South Carolina builds to the International Residential Code and that is what the code requires around a residential pool.
There are details beyond the basics: the gate should swing away from the pool, and the latch release has to sit where a small child cannot reach it. We set pool gate hardware to those requirements as a matter of course, and our pool fence page goes through the barrier rules in full.
It is a gate that rolls sideways on rollers mounted to posts, carried on a counterbalanced tail rather than a track in the ground. Nothing swings, and nothing runs in a groove that fills with gravel and leaves.
It is the answer when a swing gate cannot work: a driveway that rises away from the opening, a short driveway with no room for a leaf to swing, or a commercial yard where a gate is opened many times a day. It needs clear run back room beside the opening, roughly half again the width of the gate.
Yes, and it is worth deciding now. An operator does not make a gate stronger, it just moves a gate that already had to be built for the job, so the frame, the hinges and the posts have to be specified for automation from the start.
While the ground is open we can set heavier posts and run conduit or a sleeve under the driveway for power and safety loops. Doing that during the gate build costs very little. Doing it after the concrete is poured means cutting the driveway.
Related work
Swing and slide operators with keypads, remotes and safety loops, wired to a driveway gate that was built heavy enough to take the motor.
See automatic gate openers Call about automatic gate openers
Leaning posts, storm damage, rotted pickets and gates that drag. We repair what is worth saving and tell you plainly when it is not.
See fence repair Call about fence repair
Mixed materials, stepped runs on slopes, curved tops, matching gates and screens built to a drawing rather than pulled off a panel rack.
See custom fence builders Call about custom fence buildersFree on-site gate quotes and repairs across Anderson County and Greenville County, seven days a week from 7am to 7pm.
Seven days · Main hours 7am to 7pm · Early and evening calls 6 to 7am, 7 to 9pm